Project Rehabilitation of Yanbu College buildings
Project Detials
Sawaed Group worked on rehabilitating the university buildings for Yanbu Industrial College. This included electrical work, mechanical work, and architectural work as follows:
- Electrical Works: This involves removing all old fixtures such as lighting units, outlets, switches, camera networks, audiovisual systems, and information networks, and replacing them with modern fixtures and equipment.
- Mechanical Works: This includes removing old fixtures for air conditioning, fire protection, sewage, and water systems, and replacing them with modern systems and equipment.
- Architectural Works: This encompasses removing all current fixtures and replacing them with new finishes, including floors, walls, and ceilings, using high-quality materials such as paints, ceramics, doors, windows, granite, and marble.
The project also includes all procurement, installation, operation, and testing processes, and has been delivered to all relevant authorities.